Collect    |   Contact    |  中文 / EN
    Customer visits Current Location:Home > Customer visits

Anaerobic molten salt electroplating furnace

Release time:2023-03-22  Number of views:196

 


Equipment introduction:

Anaerobic molten salt electroplating furnace is a special equipment developed for sintering, melting and analysis of metal, non-metal and other compound materials in vacuum or atmosphere state for universities, scientific research institutes and industrial and mining enterprises.


 

 


Configuration

 

Equipment features:


1, vacuum, atmosphere sintering can be;

2, stable and reliable control, easy operation, perfect safety protection measures;

3, the use of advanced PID self-learning fuzzy control, high temperature control accuracy, keep at ±1℃;

4, the lining of high purity aluminum oxide light fiber material, better insulation effect, energy saving and consumption reduction;

5, with the Internet of Things function (WIFI), you can remotely monitor and operate the equipment through mobile phones and computers;

6, data storage function, can save the important parameters of sintering, up to 30 days (8 hours a day);

7, formula function, can pre-store more than 20 formulas;

8, networking function, through the RJ45 interface, the use of TCP/IP protocol, you can make the system connected to the upper computer (the upper computer needs to install the corresponding software).

Control system


1, sintering process curve setting: dynamic display setting curve, equipment sintering can prestore multiple process curves, each process curve can be set freely;
2, can be reserved sintering, to achieve unattended sintering process curve sintering;
3, real-time display of sintering power and voltage information and record sintering data, and can be exported to achieve paperless recording;
4, with remote control, real-time observation of equipment status;
5, temperature correction: the difference between the main control temperature and the sample temperature, the whole sintering process for nonlinear correction.

Model

NBD-HTGBWG1000-270TIDF10L

Electrical Spec

380V 50HZ/60Hz

Rated power

11KW

Tmax

1000℃

Chamber size

L1850×D880×H1990mm

Size of heating zone

Φ350*320mm

Pressure measurement & monitoring

Mechanical pressure gauge with damping oil prevents gauge pointer from being damaged (digital vacuum gauge is optional)

Reactor material

310sstainless steel  φ273*475mm

System vacuum

8000Pa

Measuring range

RT—1100℃

Heating rate

≤10℃/min

Adapter module

Equipment details

Crucible material

310S

Sample measuring environment

Air environment; Static, dynamic atmosphere environment; Or vacuum environment(≦1000℃)

Operational process


Before the equipment is used, clean the chamber with alcohol, close the J1, J2, J5 valves, open the J3, J4 valves, put the material, close the bin door 1, open the bin door 2, seal the glove sealing cover, keep the internal and external pressure connected, and start to vacuum.

2. When the mechanical pressure gauge reaches a certain value, the D1 valve starts to send protective gas, and closes the D1 valve when the micro positive pressure is reached. The valve can be reciprocated several times manually to ensure the water oxygen content.

3. Work normally, close the hatch door 2, close the J2 valve (after the material, enter the hatch door 1, then vacuum, open J2 to send protective gas to reach the micro positive pressure, close J2, stop the air supply, reciprocating 3 to 5 times to ensure that there is no water oxygen in the transition bin, open the hatch door 2 to put the material, and then close the hatch door 2.

4. When the chamber pressure is too large, D2 valve opens to relieve the pressure (not too fast), and D1 valve opens to replenish the air when the pressure is insufficient. (Pressure parameter range can be set, refer to the glove box setting)

5. Close the J3 valve and open the pressure plate on the glove. Gloves in working condition;

6. Molten salt furnace starts to work, open J5, J6 valves, adjust the flow meter to adjust the size of reaction gas;

7. After sintering is completed, put the material into the transition bin, close the bin door 2, ensure that J2 is closed, and open the bin

Door 1, take out the material.

Cautions

1. The internal pressure of the gas supply cylinder is high, and when the gas is passed into the glove box, the pressure reducing valve must be installed on the cylinder. It is recommended to choose a small pressure reducing valve for testing, and the measuring range of the pressure reducing valve is 0.01 MPA-0.15 MPa, which will be more accurate and safe in use.

2.310S stainless steel pot long-term use temperature ≦1100℃;

3. When vacuuming, the cover plate of the glove flange should be sealed with the vacuum chamber, and then open the valve on the flange pipe, and then start vacuuming, otherwise the glove will be blown when directly vacuuming;

4. During the heating experiment, always pay attention to the indicator of the pressure gauge. If the absolute pressure gauge reading is greater than 0.15MPa, the exhaust valve must be opened immediately to prevent accidents.

Standard configuration

1. Glove box + oxygen-free molten salt electroplating furnace;

2. Vacuum system 1 set;

3. 1 set of electric lifting system;

4. 1 set of water cooling system

5. A copy of the manual.

Service

1 year warranty, lifetime service (warranty does not include consumable parts)

Net weight

500KG

 


Disclaimer:

 The product introduction content of this site (including product pictures, product descriptions, technical parameters, etc.) is for reference only. There may be some difference between the stated content and the actual situation due to the delay in updating. Please contact our customer service staff for confirmation. The information provided by this Site does not constitute any offer or acceptance. NOBODY will improve and modify any information on this site from time to time without prior notice.


    Related products

 

 

 

 



















Previous article:没有了